HOME

One full Year without LTI

One full Year without LTI On the 25th of May 2010, Dhirubhai-1 celebrated one year/365 days without a lost-time incident. This is a significant milestone that has been achieved because of the commitment and dedication from the FPSO crew onboard and the onshore support team.
It is still important that we continue to strive and promote workplace health and safety. Training, management tools and procedures represent the platform, but the basic responsibility lies with each individual on board.

 

Dhirubhai-1 uptime and gas injection/export efficiency

Dhirubhai-1 uptime and gas injection/export efficiency As from Final Acceptance Certificate formal signing by both parties on 1st July 2009 Dhirubhai-1 has been producing at field capacity. Production constraints are given by well capacity. Early February 2009 two new wells were hooked for production and production was increased to approximately 3 MMSCMD gas and 20000 bbls/d oil. All gas was reinjected into the reservoir. Production was until this time constrained by well productivity and injection capacity. As from this time gas is exported via a subsea pipeline to the clients gas plant onshore.
Read more
 

Aker SMART 2 – Ready for conversion

Aker SMART 2 – Ready for conversion The conversion candidate Aker Smart 2 is the identical twin of Aker Smart 1 which was converted into “FPSO Dhirubhai 1”.
She is maintained and kept in excellent condition in the vicinity of Singapore awaiting her conversion. Aker Floating Production are in dialogue with Oil Companies that see the significant risk reducing and cost reducing benefits of utilizing 10,000 engineering documents from the sister project, when converting her into an FPSO.
Welcome to Aker Floating Production
Aker Floating Production is an oil service company focused on the market for leased Floating, Production, Storage and Offloading (FPSO) units. The company is spearheading two decades of FPSO experience within Aker. Our business is to construct, own, charter out and operate FPSOs equipped for offshore oil and gas production. In 2008 the Company completed the conversion of Aker Smart 1 into “FPSO Dhirubhai 1” in record time. She is operating in 1200m water depth offshore the East Coast of India for Reliance Industries Ltd. - with an uptime close to 100%.


SMART FPSO Concept
Aker Smart FPSOs are designed to provide the field operators with a flexible and cost effective production facility.
Read more
Financial
The Dhirubhai-1 project was funded through a combination of equity, parent company support and one of the largest syndicated loans for an FPSO project
Read more